Our history

Vertical Access Limited was established in 1988, aiming to develop industrial rope access methods and apply them to various commercial and industrial projects. Under the guidance of its two Directors, (Paul Braithwaite and Paul Bingham) the company quickly became one of Britain's leading industrial rope access companies. To this day, we are still committed to providing a fast and personal response to meet the needs of our clients.

Although we now use a variety of access systems, rope access is still at the heart of our operations. All Vertical Access personnel are trained and assessed using the IRATA training scheme, which maintains our skills as access specialists.

timeline

1988

The Company is Founded

First incorporated as Skyline Ltd

1988

First Contract

Our first contract as a company was wrapping the exterior of the Barclays Head Office in London in a celebratory ribbon

1989

Changed name to Vertical Access Ltd

The Company Name changed from Skyline Ltd to Vertical Access Ltd

1989

First Contract on a Rail Structure

Our first rail structure contract was shotblasting the stonework piers on Stockport's Rail Viaduct

1990

First Contract with Manchester United F.C.

Our first job for Manchester United was installing the outside banners for the Rugby League Final. This job established us with MUFC, where we quickly became their Go-to Working-at-Height contractor, a relationship that continues to this date [over 34 years].

1991

Vertical Access' First Big Contract

Our 1st big contract was for Greenwich Council, conducting High Rise Concrete Repairs & Anti-Carbonation Coating around Woolwich Housing Projects

1992

Our First Geotechnical Contract

Our 1st Geotechnical contract was for Bury Council, installing Rock Anchors, Mesh & Rebuilding a stonewall in Summerseat

1993

Our First Set of Contracts on the Railway

Our first set of contracts on the railway was completing Devegetation, Geotechnical and Shotcrete works on Olive Mount & Lime Street Cuttings for British Rail

1994

Manchester United Maintenance Contracts

This was the start of a series of maintenance contracts at Old Trafford, which included Steelwork recoating, installing new roof fixings and installed Cradle platforms designed by Vertical Access

1995

Highly Complex Installation Contract

Installation of 1.1km steel pipe for fibre optic cables on Runcorn Bridge, designed by WS Atkins. Our team provided detailed measurements and installation input

1997

Nuclear Reactor & Turbine Buildings Project

This began our work within the Nuclear Sector, where we were tasked with conducting DPI & NDT works on Reactor & Turbine Buildings across three Nuclear Power Station sites for MAGNOX

1996

Arndale Centre Bombing

We were part of the team, challenged with inspecting the bomb-damaged Arndale Centre, C&A and M&S Buildings via Rope Access and MEWP

1998

Tayroad Bridge Concrete Cathodic Protection System Installation

We supplied and installed a Concrete Cathodic Protection System on Tay Road Bridge in Dundee, Scotland

1999

Inspection of Nuclear Transport Loading Cranes

We conducted NDT Inspections across Barrow Nuclear Power Station's Nuclear Transport Loading Cranes

2000

Wylfa Nuclear Power Station Project

We were tasked with renewing the Water Intake Pipe at Wylfa Nuclear Power Station in North Wales

2001

Chepstow Castle Wall Repair

We began our work within the Heritage Sector by conducting wall repairs at Chepstow Castle, we also stabilised an ancient monument rock face

2002

Bradwell Nuclear Power Station Project

We designed & installed Crane Safety Systems, replaced Smoke Ventilation Ouvres & Recoated the Reactor Charge Halls at Bradwell Nuclear Power Station

2003

Champions League Final

We installed the event banners for the Juventus vs A.C. Milan Champions League Final at Old Trafford in 2003

2004

Heathrow Airport Concorde Hangar Project

We installed Fire Suppression Systems across several Hangar Roofs, including the iconic Concorde Hangar at Heathrow Airport

2005

Railtrack High-Risk Rock Cuttings

Our Geotechnical Team worked on 15 Railtrack rock & soil cuttings across the Midlands and North West of England

2006

High-Rise Framework Inspection & Repair Contract

We won a 3-year Contract with Gallions & Axis Housing Association to inspect and repair their High-Rise Framework in Thamesmead

2007

High-Rise External Cladding & Insulation Project

We installed High-Rise External Cladding & Insulation over Meshing and Refixing to six residential buildings in Bootle, Liverpool

2008

Wylfa Nuclear Power Station

We conducted inspections across Wylfa Nuclear Power Station's Pump House, Jetty & also carried out Reactor 2 Outage Works, which led to the team winning an award for their work

2009

Silver Jubilee Bridge

In 2009, we installed lighting systems and repaired the cables across the Silver Jubilee Bridge in Runcorn

2010

Ratcliffe-on-Soar Power Station

We conducted Cladding Repairs & Glazing Replacement works at Ratcliffe-on-Soar Power Station in Nottinghamshire

2011

Premier League 4G Antennae Installation

Working with Villicom, we installed several 4G Antennae across Premier League Football Stadiums

2012

Dore South Cutting Stabilisation

Our Geotechnical Team installed Soil Nails, Face Mesh & Portal Rock Barrier Mesh along the Dore Cutting in South Sheffield for CML

2013

Loch Katrine Hydro Project

Our Geotechnical Team & Confined Space Teams installed Structural Rock Anchors within the Loch Katrine Tunnels & Pipes in Scotland

2014

Llanfoist Canal & Coseley Cutting

Our Geotechnical Team installed Platipus Anchors, Soil Nails & Mesh around the Llanfoist Canal & Coseley Cutting for CPC Civils across Wales and England

2015

Harbury Cutting Emergency

Vertical Access, alongside Murphy was part of the team to quickly stabilise the cutting after a landslide had caused the failure of the embankment. Our Geotechnical Team carried out emergency works such as Soil Nailing, Meshing & Portal Brickwork

2016

Telecom Inspection & Repair Framework

Our Structural Team was tasked with inspecting & repairing the Telecom Framework across several UK sites, including BT's Head Office in London

2017

Peth Heath Slope Stabilisation

This Slope Stabilisation for Karbon Homes was a Vertical Access Design & Build Project on a Housing Association Site in Hexham

2018

Heathrow Airport Coating Project

Working with the Morgan Sindall Company, we had the great opportunity to work on the Heathrow Airport Control Tower. Our Structural Coatings Team were challenged with coating the exterior of the tower, which was a great Rope Access access project for the company

2019

Liverpool Lime Street Cutting

Working on the Lime St Cutting, Vertical Access Ltd was part of the electrification of the rail track. This included the installation of OLE Renewal 500+ Resin Anchors, 100 Steel Brackets, Electric Cabling & Stonework Repairs. This project later won two awards for 'Putting Passengers First' and 'Best Collaboration'

2020

Rail Infrastructure Supplier

Working with Murphy for Network Rail, Vertical Access was appointed as key supplier under the COVID-19 regulations. Our team conducted Slope Stabilisation Projects, Stone Wall Rebuilds and other Geotechnical work across 40 sites throughout the North West of England

2021

Old Trafford Stadium Floodlights

We were tasked with installing Floodlights around Old Trafford Football Stadium. The lighting was undertaken in accordance to UEFA Champions League Standards

2022

Major Network Rail Project

In 2022, Vertical Access was awarded the contract to stabilise the South Cutting Slope in Chorley, Lancashire. The Slope Stabilisation Project included installing x2000 Soil Nails, 10,000m2 Mesh, Slope Drainage, Access Steps & Handrails

2023

River Aire Flood Alleviation Scheme

Working for BAM, our Geotechnical Team was tasked with installing a Flood Alleviation Scheme on the River Aire in Leeds. This included installing Platipus Earth Anchors, which were supporting steel piles. We conducted the works by working from a pontoon on the river to install the Anchors underneath the existing rail infrastructure

2024

Manchester Town Hall

Our Structural Team was part of the Manchester Town Hall Restoration Project. Vertical Access designed & installed Belfry Platform Access Systems and other installation & repair works on the Clock Tower

Date

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

Date

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

Date

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

Date

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

Date

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique.

Get in touch

Book a discovery call to discuss what we can bring to your business
Contact us today to discuss how we can help your project!